Customer: Kosovo Energy Corporation, Power station Kosovo B
Date: 4/2018 - 9/2019 (Stage I, 4 - 9/2018, Stage II, 5 - 9/2019)
The belt conveyors coal transport from the coal mining site to the power station consists of two routes, total length of about 3 km (1 route). The modification it will began in two stages. The first stage was implemented last year and the first route is now fully working. The second stage started in May 2019 and it is planning to be finished in September 2019.
In 2016, a consortium of ALTA, a.s., and ELCOM, d.o.o., was founded to win a contract in a public tender to carry out a comprehensive upgrade of belt conveyors coal transport at Kosovo's B power station.
Our company, as a subsidiary of ALTA, a.s., participated in the project as a successful subcontractor. We have prepared drawing documentation of steel structures modifications for the installation of new drives and drums, etc., as well as the production of the following components:
Belt conveyor drums
- driving diam. 1250mm L=1700mm
- driving diam. 1000mm L=1900mm
- reverse diam. 800mm L=1700mm
- discharging diam. 800mm L=1900mm
- tightening diam. 630mm L=1700mm
- supporting diam. 500mm L=1900mm
Drums dynamically balanced according to CSN ISO 1940-1 standard, rubberized with hardness 65+5 Shore A according to DIN 53505.